Home  /  Guides  /  Commercial Energy Storage Sizing Guide

Sizing Guide

Commercial Energy Storage Sizing Guide: 0.5–522kWh Systems

An energy storage system is defined by two numbers — power (kW) and energy (kWh) — and getting either one wrong means paying for capacity you never use, or running dry when you need it most. This guide shows how to size a system from your actual load, from a 0.5kWh home unit to a 522kWh container station.

Updated 22 November 2026 · Tongxing New Energy · Kashgar, China

1. Power (kW) vs energy (kWh): the two numbers

Every storage inquiry starts with the same confusion, so it is worth stating plainly:

A system sized for backup needs enough energy to cover the outage. A system sized for peak shaving needs enough power to clip the peak, and enough energy to last through the peak period. Always size both numbers from the job, never from a single headline figure.

2. Five sizing steps

  1. Map the load. List the loads the system must serve, their power draw, and when they run. A load profile — even a rough one from electricity bills — beats any guess.
  2. Separate critical from optional loads. For backup, size to the critical loads (lighting, refrigeration, communications, essential equipment), not to the whole site.
  3. Set the backup duration. How many hours must the system carry those loads? Duration × critical load = the minimum energy you need.
  4. Account for solar, if any. A solar array changes the math: daytime solar can recharge the system and cover daytime loads, so the battery mainly needs to cover evenings and cloudy periods.
  5. Check the grid connection. The site's connection limits how fast the system can charge from the grid, and whether export is allowed. Confirm both with your utility before finalising the size.

3. System forms: from home to container

Tongxing storage covers 0.5kWh to 522kWh across five forms. The right form follows the size and the site:

FormTypical useNotes
Home storage unitsHousehold backup, solar self-consumptionCompact, wall- or floor-mounted; start of the range at 0.5kWh
Air-cooled cabinetsSmall commercial sites, shops, officesSimple cooling, lower cost; suited to moderate climates and loads
Liquid-cooled cabinetsLarger commercial and industrial sitesBetter thermal control for high-power, high-cycle operation
Solar-storage-charging all-in-oneSites combining solar, storage and EV chargingOne integrated unit for solar + storage + charging
Powermax container energy stationLarge commercial, industrial and off-grid projectsContainerised, up to 522kWh; factory-assembled for fast deployment

Mobile top-up units cover a different need: temporary or emergency charging and power where no fixed installation exists.

4. Sizing by use case

Home backup and solar self-consumption

Size to the evening load after solar stops producing, plus the critical loads you want during an outage. Most homes need far less than they assume — the critical-load list is usually short.

Commercial peak shaving

Size power to the peak you want to clip, and energy to the length of the peak period. The saving comes from demand charges and peak tariffs, so the first step is reading your tariff properly — see the economics note below.

EV charging support

Storage at a charging site absorbs peaks so the grid connection can be smaller than the chargers' combined power. Size it from the chargers' power, the expected simultaneous sessions and the grid limit. Our DC fast charger buying guide covers the charger side, and the charging station investment guide covers the business case.

Off-grid and microgrid

Off-grid sizing is the most demanding case: the system must cover the full load through the longest cloudy stretch your site experiences. Always size with margin, and pair with enough solar to recharge on a normal day.

5. Check the economics before you count on arbitrage

Peak-valley arbitrage — charging cheap at night, discharging at peak prices — only pays where the price spread covers the cost of storing each kWh. It does not work everywhere. In Xinjiang, for example, the peak-valley spread is only ¥0.16–0.29 per kWh, below the per-kWh cost of storage at ¥0.35–0.45 — so arbitrage alone does not pay back there, and storage must earn its keep from backup, demand-charge reduction or solar self-consumption instead.

Rule of thumb: before budgeting any storage project on arbitrage, get your local peak and off-peak tariffs and compare the spread against the system's per-kWh cost. If the spread is smaller than the cost, plan the business case around other value — backup, demand charges or solar use — not arbitrage.

6. Documents and compliance

Storage systems cross borders as battery products, so documentation matters: Tongxing storage is supplied with UN38.3, MSDS, CE and FCC documentation as applicable to the model. Confirm which documents your market and your shipping route require before ordering, and ask for the document list with your quotation.

7. Buyer checklist

Get a system sized for your site

Send us your load list and your tariff, and our engineers will size the right system — home units from 0.5kWh, air- and liquid-cooled cabinets, solar-storage-charging all-in-one units, and Powermax container stations to 522kWh. Factory-direct from Kashgar, with 26 years of group experience and 5,000+ partner enterprises.